http://www.tuv.com/    

TÜV Rheinland Philippines Ltd.

 
 
Home || Services  | Training & Education | TUVdotCOM | Login
Select a country

Low Voltage Equipment

   
Image
Services
· Product Testing
· System Assessments
· Certification Services
   
Image
 
 
Home > Services > Product Testing > Low Voltage Equipment > Detailed procedures    
    
 

One-Stop Testing Procedures / Safety Approval Procedure

To get one of these certificates GS/CoC/TÜV / TÜVNRTL / NOM / S+/ Nordic Approvals / GOST R / CB/S-Mark / others and for technical inspections, the procedure is as follows:

1. Introduction Meeting

2. Technical Meeting

3. Precheck

4. Inspection

5. Preparation of documentation & test report

6. Certification

7. Annual factory inspection

1. Introduction Meeting
We will hold an Introduction Meeting at our office or at yours so that we can get to know you and

· introduce TÜV Rheinland to you
· explain the procedure of the safety approval
· explain our fees
· schedule the testing and make an estimate (first time clients only)
· receive your application (application form)

2. Technical Meeting
After the Introduction Meeting follows a Technical Meeting to investigate applicable EU directives (if you apply for a European testmark)

· investigate applicable standards
· perform technical Q&A

Note: Experienced clients may skip steps 2 and 3.

3. Precheck
Next, we do a precheck and devise a test plan. That means


· TÜV Rheinland performs a brief construction check of the product
· we explain the inspection procedure
· we explain the inspection items and which documents are required
· we explain the required test equipment

Note: Experienced clients may skip steps 2 and 3.

4. Inspection
Then follows the inspection with

· witness testing
· construction check
· technical documentation evaluation
· component evaluation
· verification of test results / procedure
· verification of test equipment
· documentation handling

5. Preparation of documentation & test report
Afterwards, TÜV Rheinland will prepare the documentation and issue the test report (optional).

6. Certification
Finally we will issue the certificates.

· issue of various safety licenses
· issue of certificate of conformity (optional) and provide the necessary declaration forms

7. Annual factory inspection
To verify the quality system of the production line, we perform regular factory inspections according to the relevant underlying regulations ( annually or every 2 years, depending upon the certificate).

For more information please contact us.

 

 

Imprint | © TÜV Rheinland Philippines Ltd.